Sign in to follow this  
Followers 0
mfuglsang

Graph on NS8-TV01B-V2

3 posts in this topic

--ORIGINAL-- English Danish Dutch French Finnish German Italian Japanese Norweigan Polish Portugese Romanian Russian Spanish Swedish Hi. I am making a project where we are building a chechweigher. And then we woukd like to have a panel (NS8-TV01B-v2) where we can see how the last 100 cans have been weighing. That i would like to do on a graph, where there are some dotted lines that shows the upper weight limit, lower weight limit and ideal weight. And then a solid line that shows the last can. The graph should only update when a new can is weighted. I have been trying to solve this problem for days now, but i cant make it work like i would like to, so i hope some of you have the answer for me :) My problem is that i dont want time on the x-axis. The x-axis sould be 100 points that corresponds to the last 100 cans, and ONLY update the graph when a new can is weighted. Then the graph sould move 1 step on the x-axis.. I have attached some pictures from another machine on the factory that can show a graph just like the one i would like to.. But can i make that in cx-designer??? Hope that it is to understand what I mean. it is a little bit hard for me to explain in english.. Regards Morten

Share this post


Link to post
Share on other sites
Look at Broken Line Graph and keep the logged values in the PLC.

Share this post


Link to post
Share on other sites
comming in a bit late but i second what jay is saying.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0