Search the Community

Showing results for tags 'overlap'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Found 1 result

  1. So I have done quite a bit of googling and i even reached out to our integrator but i am having a nuisance fault of "Watchdog Fault" Caused by periodic task overlap. The task is scheduled to start again before it is finished. I added all of the Programs in this task MAX scan time and it only came out to 102 ms. the task is scheduled for every 100 ms. The watchdog is set at 500 ms. The task is currently running at 146-148 ms and i confirmed this using a TON instruction at the end of the task followed by a reset. What can i do to get this down?? What would be the best practice? Move programs into another task? Make the task continuous? What would happen if i did make it continuous? I tried setting the task to 150 ms and the controller DID NOT like that. I was barely able to get back on line with it to change it back to 100 ms. CPU usage is at 91% and this task accounts for around 50% of that. Thank you all in advance for your help.