Posted 10 Jan 2023 Hello everyone, I was wondering if anyone could assist me as to why my G5 servo resets and goes into a ready state. but when I issue a MC_power it goes busy and doesn't complete. I am using a Omron Nx102 controller and NB HMI with FINS protocol via port 2 FYI LINK to screenshot: https://freeimage.host/i/H7gJRXn Share this post Link to post Share on other sites
Posted 10 Jan 2023 Are there any other motion instructions being executed at the same time or is there a test run in progress? Share this post Link to post Share on other sites
Posted 10 Jan 2023 Figured it out. Ran a test run and found the fault. thanks for your help good sir Share this post Link to post Share on other sites
Posted 12 Jan 2023 Well how about sharing with this forum what the fault was and how you resolved it? 1 person likes this Share this post Link to post Share on other sites