Posted 19 Feb 2022 (edited) Hi everyone. I need help with iQ-R system. Is it possible to connect an additional expansion bus to an existing system without powering down? Also, can I install new I/O module (RX40C4) to an existing system at hot state (like a hot swap)? Edited 19 Feb 2022 by CSEngineer Share this post Link to post Share on other sites
Posted 19 Feb 2022 No and No. You will need to update the I/O Map in the controller to add more modules, and this cannot be done without stopping the CPU and downloading an updated project. And modules should not be removed under power, you will error out the CPU and crash the line. Share this post Link to post Share on other sites
Posted 20 Feb 2022 6 hours ago, Crossbow said: No and No. You will need to update the I/O Map in the controller to add more modules, and this cannot be done without stopping the CPU and downloading an updated project. And modules should not be removed under power, you will error out the CPU and crash the line. So I need stopping CPU or shutdown all system? Share this post Link to post Share on other sites
Posted 20 Feb 2022 Depends what duties that CPU is doing in your system. It is common for the duties to be critical, so total production stoppage is normal for CPU stop. Share this post Link to post Share on other sites