CalyptoGraphite

VM With Studio 5000, FTVSE, Emulate 5000

6 posts in this topic

Ok, so I was tasked with setting up a virtual for our development team to be able to use to quickly deploy projects hmi, emulated plc, and studio 5000 project together on one virtual.  The main reason for this is when we get a project, many times we have to wait for an available plc.  We have plc’s in our rack but they can’t be used because they are being used for other projects.  I’ve used the compatibility matrix that Rockwell has but my boss wants to stick with Windows 10 Professional like we do in most our projects but according to the matrix, it looks like having FactoryTalk View SE Enterprise version 10, Studio 5000 Logix version 33 and Studio 5000 Logix Emulate version 33, FactoryTalk Gateway 6.11 and RSLinx 4.11 (mainly for communication to the emulated plc) but in the matrix says Windows 7 and Windows Server 2012  is the best choice.  I’ve ran into issues with Emulate opening, it takes up to 20 minutes to open.  Our licenses are on a server and accessed using FactoryTalk Activation Manager and all the activations are there.  Any suggestions would be appreciated.

Edited by CalyptoGraphite

Share this post


Link to post
Share on other sites

I tried to do it too but had the same problem as you. My opinion the main issue is HW requirements not OS compatibility. 

Share this post


Link to post
Share on other sites

Well, this morning I decided to borrow the activations I needed to my virtual and then I started Emulate and I timed it and it took 5 seconds to load, before it would take almost 20 minutes and FactoryTalk View Studio took 5 seconds to open and before took around a minute and Studio 5000 took 15 seconds to open and before took about 30 seconds to open.  So I think that Rockwell Software has an issue with remote activations.

Share this post


Link to post
Share on other sites

I've seen bad things with remote activations too. I have mine hosted to my host PC with FT Activation Manager on the VMs pointed to the host. No issues with speed at all. I'm not using SE or emulate, though. Just RSLogix 500/5000, Studio 5000, and FT View Studio for ME.

At a previous location, we had to share a couple of licenses so we hosted them on a PC that we could all ping through the network. It mostly worked, but I did see some opening time issues. I found this AB KB article that discusses some activation and firewall issues (access level: everyone):
https://rockwellautomation.custhelp.com/app/answers/answer_view/a_id/36198

 

Share this post


Link to post
Share on other sites

Thanks for the reply, ya we just disable the firewall since we're always behind the sites firewall

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now