Posted 25 May 2017 Hello to all my name is Enrique this morning I was working on robot crane this machine is Designed to hold 50 tons is made to run with 4 separate drives Sew this morning I found the drives with F28 on all drives the only way to clear the fault was by power the machine of and re power the drives this is not the first time please help thanks Share this post Link to post Share on other sites
Posted 29 May 2017 1. You did not specify the drive model. We cannot read your mind. 2. Why would not you get the drive manual and find the explanation of this error? 3. This may be not an error, but a specific mode of the drive display. (F may stand for function). Share this post Link to post Share on other sites
Posted 30 May 2017 Generally the F28 is fieldbus timeout (this may be caused by a momentary loss in the fieldbus comms), to reset this type of fault a power cycle of the drive is required. this is assuming you are using a movidrive inverter Steve Share this post Link to post Share on other sites