Posted 5 May 2016 (edited) Changing the project view to display symbols on each contact within a segment of the project Step 7. Several possibilities of using the symbols above or below the segment contact, depending on the way to work ...Read more http://www.tecnoplc.com/visualizar-s...tactos-step-7/ Greetings. _________________________________________ PLC programming and HMIhttp://www.tecnoplc.com Edited 5 May 2016 by tecnoplc Share this post Link to post Share on other sites