Search the Community

Showing results for tags 'synchronizing'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Found 1 result

  1. I have two PF527 devices in a bus. These are in the same motion group. If I take the ethernet cable off, it will not connect the PF527 anymore back to the be controlled. I can find it on the net (ping is OK) and it is not showing any fault. In the PF527, there is reading 'connecting' and in the Studio5000 axis is showing 'Synchronizing'. Any resetting from the PLC does not affect to the situation. Also taking power off and on from the PF527 does not help. Only way is that I switch off the power from the PLC and after that it will be fine. I would like to understand, what is happening at this moment when it is synchronizing and why it is not successful? Is there any other way to get PF527 back to normal state than the PLC power off / on?