Search the Community

Showing results for tags 'silo filling'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Found 2 results

  1. Hi All! Can anyone help me regarding the following logic: 1. I have four Silos and one filling station. 2. The filling of silos starts on the bases of silo demad (i.e demand is a digital signal that comes when silo is empty) 3. I have to fill all silos according to their demand 4. Whose demand is first that is filled first 5. for e.g if all four silos are empty they all generate a demand signal. 6. If Filling of silo 1 is done and filling is in progress at silo 2 after that filling will start  in silo 3 then silo 4 as they are empty 7. In the mean time  if silo 1 empy again and filling is in progress at silo 2. The system must fill silo 3 and 4 first then go to silo 1  8. It means which demands first that is filled first (first come first serve)   
  2. Can I use a touch panel like magelis (schneider electric) or Panel View (AB) with a stand alone PLC to monitor the level of a silo in real time or would have to be a SCADA system?