Search the Community

Showing results for tags 'peak to peak hold'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Found 3 results

  1. Anyone have experience with the Peak to Peak hold function on Keyence IL-1000 amplifier?  I have an IL-030 lase head running off it and I want to utilize the peak to peak hold function.   I connected the red wire from a generic 24VDC, 1A, power supply to the IL-1000 Pink/Purple (timing input wire) and the black wire from the power supply to IL-1000 Blue (0V).   I have a 24VDC, 5A, power supply connected to IL-1000 Brown (10-30V) and IL-1000 Blue (0V) to power the IL-1000.   What I thought might work is to plug the 24VDC, 1A power supply in and out of an outlet to trigger the timing input for the P-P hold (similar to an on/off button).  But it's not doing anything.   I am not an electrical guy.  Any tips here?  Thanks,
  2. Hi all I have a project where i am building a bread softness tester.  To do this i am using a smc electric actuator and an A&D scale. The electric actuator will push down on a slice onto an A&D scale.  A micro830 plc is then reading the data from the scale and storing the real variable in an array 80values long.  I would like to display on the hmi (panelview800) the peak/maximum value in the array. I am struggling on how to do this though and have not found much information online. any help would be much appreciated Thanks in advance Trevor
  3. FX3G-2AD-BD Store Peak Value

    Good day, I'm new to this forum and to mitsubishi PLC but was hoping for some assistance with a programming issue. I have been through the hardware and programming manuals without luck for this issue. Hardware: FX3G-60mt FX3G-2AD-BE Settings: Structured ladder/FBD Current input mode on: M8260 (first board, first input)   What I need to do is to record the peak value over a cylinder stroke period. The hardware manual explains how to average the value using averaging time, however I basically need to peak hold and send that to a D register for go no-go compare.    Process as follows: Contact closed, monitor D8260, contact open, move peak value from D8260 during monitor duration to D205.    Thanks in advance for any assistance. -Swervomotor