I've been handed a project where the mechanical engineer is going to install a platform for a new induction welder over the top of an existing machine. The problem is that the bottom of the platform will probably barely clear the existing main wireway for the rest of the machine. Oh, and the platform design is already "set" since the final welder design was accepted in February, before I came on board.
I know the wireway must be moved for noise immunity and future accessibility (mostly accessibility). Are there any standards I can quote that say how much room is needed around the wireway hatches or recommended distance for noise resistance for the control signals passing by the welder? (All control signals are 120VAC on this machine.)
I simply want to make sure that a non-engineering manager understands why I'm going to unwire & rewire the entire machine. He understands such things as "Code requires it." If it gets more complex, I'll have to write up a justification.
Thanks,
Susan