QUOTE(stickman47 @ May 21 2009, 09:14 AM) [snapback]82502[/snapback]
The wiring from the 60 to the 30 needs to be sized for 60 amp. Keep in mind that THHN or THHN-2 is rated at 90 degrees c., but most switchgear is rated at 60 deg.C so you have to size the wiare accordingly. Your secondary wiring can be sized acording to the load (15a) but the de-rating factor for 60 deg. is still in effect. The best source for information is the UGLY's book. It has the derating tables.
Thanks!!