Hey Guys,
How does one calculate motor fusing requirements?
I would like to fuse before the starter and at the main disconnect. (10 ft away)
Example: 3 HP Motor: 460 (480) Volts: 4.8 FLA:
Would I take 4.8 * 120%? (Before motor starter)
Would I take 4.8 * 150%? (At the Disconnect)
How does one calculate disconnect fusing with 5 motors. (Using above example)
"You definitely want to add all of the MAX amps for a total full load rating. That becomes the worst case scenario. Then add 10 to 50% for heat de-rating. Your local code should be consulted for the exact amount of de-rating based on length of the cable run"
"For panels with motor loads you typically take the motor with the largest current draw and multiply it by 125%, then add all of the other motor loads to that for a total (of motors only). Then add in other loads such as transformers, etc."
Are the above statements correct?