mr_electrician

Description Entry

4 posts in this topic

With Rockwell you can easily and quickly develop I/O description in excel using a CSV file.

Does CX Programmer have a similar feature?

Share this post


Link to post
Share on other sites

Copy from the I/O table - Ctrl C - Ctrl V into excel. The I/O number column will need to be formatted to number. Then just copy oiut of Excel into your symbol table. No need for import and export.

Share this post


Link to post
Share on other sites

I think @BobB has a typo above, he meant "Copy from the Symbol table..."

Share this post


Link to post
Share on other sites

Thanks Michael - just back last night from a hard week programming a pile of tricky stuff for NASA - all online - live site. We have to deal with a site wide UPS, rotary converter, mains and 8 generators and not turn the radio telescopes off. Challenging sometimes. There is no N+1 for the UPSs so if something goes wrong with one or more of them we start generators and co-generate with the UPS - or rotary converter if it is in action. I was very mentally tired - 9 hours a day for 4 days - Friday was good they were testing what I programmed. No blackouts and worked perfectly thankfully.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now