Posted 16 Apr 2008 Hi there, I've a question about the clock of a CJ1M. Some time ago I downloaded Sleepy Wombats FB to extract date and time, thanks for that!! (I even heard someone calling it "the wombat code") I've used it in a program where on specific times a fan should work. Because of the specificy I want to check wether to clock is running or not. So I want to ask if there's a sort of control-word for checking the clock. What is the best way to achieve this? Carol Share this post Link to post Share on other sites
Posted 17 Apr 2008 Hello Carol, The clock is always running in a CJ1 PLC. It cannot be stopped. If you want to be sure, A351 (bits 0 to 7) contain the clock 'seconds' value, so you could check that this value is changing. Share this post Link to post Share on other sites