Frans@TCPM

MrPLC Member
  • Content count

    2
  • Joined

  • Last visited

Everything posted by Frans@TCPM

  1. Hi, I have a challenge with GX developer version 8.63R (SW8D5C-GPPW-E). I'm trying to verify 2 projects (offline). Some programs I know there are changes but they are not shown in the verification. In 1 program I did see the last checked change was in step 1496 (next change I did see by manual check was step 1502. it seems like this type of verification is limited to 1500 steps to check. Is there any way I can make this offline verification work? the most progams that we have in our project are over 2000 steps. big thanks in foreward
  2. thx for the response, this project is runing on a Q12H CPU. about the licence, my colleagues are telling me it's a full licence. personal I'm totally new in Mitsubishi. how does it work to update GX developer? I FOUND THE CAUSE!!: "Suspended because unmatched No. of items exceeds 100." a little detail to the project. somehow we lost all comments between the networks (all device comments are still present). So in a verify we get a lot of mismatching items. does anyone know if this is an setting or fixed limit?