Mapl

MrPLC Member
  • Content count

    1
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Mapl

  • Rank
    Hi, I am New!

Contact Methods

  • Website URL http://

Profile Information

  • Location Sydney
  • Country Australia
  1. As much as I dislike the Labour Government, I can not blame them for a situation that creates work like this.The electrical inspection system is stiil in place and working fine. This sort of work is usually done after any inspection, most electrical inspectors do not want to look inside the control cabinets as long as the supply to it is wired correctly and has the correct protection. I have found alot of system like this where the equipment has been installed correctly and along come the PLC programmer and adds his little bit. There is a lot of programmers out there that do not have a electrical license or the eqiuipment to do the job correctly. they may know how to program but bluff their way through when it come to installing electrical gear. and in this case do not understand the new safety standards. I have seen alot of panels like this around the world, and have had panel arrive from overseas in not much better condition.Even when you point out to the customer that it is unsafe and does not comply to the local safety standards, they do not care they just want it running.